Construction project at the St. Nicholas Shrine in NYC at the World Trade Center. Contracted to wrap 60 foot diameter dome,ย 15 foot tall surrounding structure below the dome and theย parapets on each corner were also enclosed. Shrink Wrapย was completed in order to allow for interior work to be completed before roof is installed.
During the time ZAPโs system was in place it was subjected to a multitude of different weather conditions including extreme temperature swings, high winds, ice, and snow. None of which compromised their system or required maintenance.
- Nolan Adams,
The Pike Company